London Waterloo WAT

Due Expected P Destination Service Operator
10:50 On time 9 Salisbury From London Waterloo South Western Railway
10:50 On time 2 Woking From London Waterloo South Western Railway
10:52 On time 23 Addlestone From London Waterloo South Western Railway
10:53 On time 1 Guildford From London Waterloo South Western Railway
10:54 On time 15 Alton From London Waterloo South Western Railway
10:57 On time 5 Hampton Court From London Waterloo South Western Railway
11:00 On time 12 Petersfield From London Waterloo South Western Railway
11:00 On time 22 Twickenham From London Waterloo South Western Railway
11:03 11:10 Guildford From London Waterloo South Western Railway
11:03 On time 21 Windsor & Eton Riverside From London Waterloo South Western Railway

Two of the four escalators at Exit 2 are being replaced at London Waterloo station.

Work will take several months to complete and during peak times you may be asked to use an alternative route. Thank you for bearing with us as we bring you more reliable escalators. The lift at Exit 2 will remain in operation during these works.

One of the three escalators at the sidings are out of use.

To exit the sidings or access the London Underground, please use the alternative escalator, or the staircase or lift located at the end of the sidings corridor.

Please speak with station staff if you require further assistance.

Trains between Petersfield and Haslemere will be delayed or revised. More details and the full impact to your journey can be found in Status and Disruptions.
Trains running through Surbiton may be delayed by up to 15 minutes or revised. Latest information can be found in Status and Disruptions.