Redhill RDH

Due Expected P Destination Service Operator
22:07 22:18 3 Arundel From London Victoria Southern
22:15 On time 2 London Bridge From Horsham Thameslink
22:21 On time 1B Tonbridge From Redhill Southern
22:30 On time 2 Reading From Gatwick Airport Great Western Railway
22:32 On time 3 Three Bridges From London Bridge Thameslink
22:39 22:39 1B Gatwick Airport From Reading Great Western Railway
22:44 22:51 3 Horsham From London Victoria Southern
22:47 On time 2 London Bridge From Three Bridges Thameslink
22:53 On time 2 London Victoria From Arundel Southern
23:06 On time 3 Arundel From London Victoria Southern

Major engineering work between London St Pancras International and London Blackfriars will mean that no Thameslink trains can run through central London from Saturday 23 May until Monday 25 May inclusive. More details and the full impact to your journey can be found in Status and Disruptions.

The lifts are out of order between platforms 1, 2 and 3 and the subway at Redhill station.
Trains between Havant / Cosham and Portsmouth Harbour may be cancelled, delayed by up to 75 minutes or revised. More details can be found in Status and Disruptions.
Trains between Peterborough and Hitchin may be delayed by up to 30 minutes or revised. More details can be found in Status and Disruptions.